1 00:00:01,626 --> 00:00:04,086 >> Devan Bolch: Russian EVA 34 will be conducted 2 00:00:04,086 --> 00:00:07,386 by Fyodor Yurchikhin as EV1 in the red stripe suit 3 00:00:07,386 --> 00:00:10,286 and Alexsandr or Sasha Misurkin will be EV2 4 00:00:10,286 --> 00:00:11,386 in the blue stripe suit. 5 00:00:11,846 --> 00:00:16,006 Sasha will egress Pirs docking compartment 1 or DC1 first, 6 00:00:16,006 --> 00:00:19,616 and Fyodor will pass out the universal EVA cable carrier 7 00:00:19,816 --> 00:00:22,676 with a two MLM power cables along 8 00:00:22,976 --> 00:00:26,086 with a few EVA installable cable fair leads. 9 00:00:26,086 --> 00:00:29,926 Fyodor will also pass out the MLM Ethernet cable reel 10 00:00:29,926 --> 00:00:32,286 and two temporary connector patch panels. 11 00:00:32,576 --> 00:00:34,716 He'll also pass out gap spanners 12 00:00:34,716 --> 00:00:36,956 and Vinoslivost panel number two. 13 00:00:37,436 --> 00:00:41,706 Then Fyodor will egress. 14 00:00:41,806 --> 00:00:44,516 Sasha will take the Ethernet cable reel bundle 15 00:00:44,516 --> 00:00:46,096 and Vinoslivost number two, 16 00:00:46,096 --> 00:00:48,606 and Fyodor will take the universal cable carrier 17 00:00:48,606 --> 00:00:49,846 around DC1 to Strela 1. 18 00:00:50,516 --> 00:01:02,076 [ Pause ] 19 00:01:02,576 --> 00:01:05,196 At Strela 1's endovector [phonetic], 20 00:01:05,726 --> 00:01:08,446 the two will attach the universal cable carrier 21 00:01:08,446 --> 00:01:09,966 to Strela 1's endovector. 22 00:01:10,516 --> 00:01:18,476 [ Pause ] 23 00:01:18,976 --> 00:01:23,136 Sasha will translate up Strela 1 to Emeron 2 24 00:01:23,206 --> 00:01:25,976 and [inaudible] stow his hardware on Emeron 2's handrail. 25 00:01:26,516 --> 00:01:37,006 [ Pause ] 26 00:01:37,506 --> 00:01:40,976 Sasha will then make his way to Strela 1's operator post. 27 00:01:41,516 --> 00:01:55,786 [ Pause ] 28 00:01:56,286 --> 00:02:00,206 Sasha will then manually maneuver Strela 1's boom 29 00:02:00,206 --> 00:02:03,416 with Fyodor and the universal cable carrier at the endovector 30 00:02:03,866 --> 00:02:06,976 to the FTB near the US and Russian interface. 31 00:02:07,516 --> 00:02:46,136 [ Pause ] 32 00:02:46,636 --> 00:02:48,336 Fyodor will attach a tether 33 00:02:48,336 --> 00:02:50,976 from the Strela 1's boom to an FGB handrail. 34 00:02:51,516 --> 00:03:03,016 [ Pause ] 35 00:03:03,516 --> 00:03:07,336 Fyodor will translate to Strela cradle near Strela 2 36 00:03:07,336 --> 00:03:08,526 and retrieve the cradle. 37 00:03:12,476 --> 00:03:15,916 He will take the cradle back to Strela 1 and attach the cradle 38 00:03:15,916 --> 00:03:19,926 to the FGB and Strela 1 to stabilize Strela 1's boom. 39 00:03:24,526 --> 00:03:27,316 And will also release the tether 40 00:03:27,316 --> 00:03:31,206 from Strela 1 once this cradle is attached. 41 00:03:35,866 --> 00:03:38,416 Fyodor will then relocate a cable connector 42 00:03:38,416 --> 00:03:39,976 that was routed on a previous EVA. 43 00:03:40,516 --> 00:03:47,506 [ Pause ] 44 00:03:48,006 --> 00:03:51,976 He will then install a few cable fair leads on the FGB. 45 00:03:52,516 --> 00:04:01,336 [ Pause ] 46 00:04:01,836 --> 00:04:05,146 Sasha will install the Vioslivost number 2 47 00:04:05,486 --> 00:04:08,976 on the backside of MRN 2. 48 00:04:09,516 --> 00:04:21,936 [ Pause ] 49 00:04:22,436 --> 00:04:25,486 He will also install the two connector patch panels he 50 00:04:25,486 --> 00:04:25,976 brought out. 51 00:04:26,516 --> 00:04:43,826 [ Pause ] 52 00:04:44,326 --> 00:04:47,536 Sasha will also install a gap spanner 53 00:04:47,536 --> 00:04:49,966 between Emeron 2 and the FGB. 54 00:04:50,516 --> 00:04:58,496 [ Pause ] 55 00:04:58,996 --> 00:05:01,336 Once the gap spanner's installed, Sasha will translate 56 00:05:01,336 --> 00:05:03,356 down FGB to Fyodor's worksite. 57 00:05:04,406 --> 00:05:07,336 Sasha will then route the MRN power cable number 1 58 00:05:07,396 --> 00:05:10,156 down the FGB to Emeron 2, installing it 59 00:05:10,156 --> 00:05:12,426 in the cable fair leads previously installed. 60 00:05:13,316 --> 00:05:15,346 Fyodor will stay at the cable carrier 61 00:05:15,346 --> 00:05:17,616 and then wind the cable as Sash routes it. 62 00:05:17,646 --> 00:05:21,406 In the digital display, you can see that the cable is flashing 63 00:05:21,406 --> 00:05:22,686 and is already installed. 64 00:05:23,516 --> 00:05:44,026 [ Pause ] 65 00:05:44,526 --> 00:05:48,296 Once at Emeron 2, Sasha will attach cable number 1 66 00:05:48,856 --> 00:05:53,616 to the connector patch panel previously installed, 67 00:05:53,686 --> 00:05:56,056 and any excess cable will be attached 68 00:05:56,056 --> 00:05:57,426 to an Emeron 2 handrail. 69 00:05:57,806 --> 00:06:01,566 Once the cable is attached to the patch panel, 70 00:06:01,796 --> 00:06:04,336 Fyodor will take the remaining cable from the cable carrier 71 00:06:04,336 --> 00:06:06,816 and attach it to the FGB handrail. 72 00:06:12,426 --> 00:06:15,216 Then Fyodor will translate down the FGB 73 00:06:15,216 --> 00:06:18,546 to Emeron 2 removing the slack from cable number 1. 74 00:06:23,266 --> 00:06:25,776 Once power cable number 1 is secure, 75 00:06:25,776 --> 00:06:29,426 Fyodor will route the MLN Ethernet cable down the FGB, 76 00:06:29,716 --> 00:06:33,036 attaching it into previously installed cable clamps. 77 00:06:33,736 --> 00:06:37,566 Sasha will stay at the Ethernet cable reel, unwinding the cable 78 00:06:37,566 --> 00:06:39,986 as Fyodor routes it, and, again, 79 00:06:40,046 --> 00:06:42,166 the digital display shows the cable flashing 80 00:06:42,166 --> 00:06:43,526 and already routed. 81 00:06:47,236 --> 00:06:51,606 The Ethernet cable connector will temporarily be attached 82 00:06:51,606 --> 00:06:54,676 to an FGB handrail near the US and Russian interface. 83 00:06:58,666 --> 00:07:02,316 Once Fyodor is finished attaching the Ethernet connector 84 00:07:02,316 --> 00:07:06,816 to the FGB, Sasha will install the Ethernet cable into clamps 85 00:07:06,816 --> 00:07:10,316 at the end of the FGB and the MRN 2 interface. 86 00:07:14,086 --> 00:07:17,576 Then Sasha will translate back to the universal cable carrier 87 00:07:17,856 --> 00:07:20,586 on the FGB and along the way taking the slack 88 00:07:20,586 --> 00:07:21,966 out of the Ethernet cable. 89 00:07:22,516 --> 00:07:37,616 [ Pause ] 90 00:07:38,116 --> 00:07:42,496 Fyodor will now route MLN power cable number 2 along the FGB 91 00:07:42,496 --> 00:07:46,756 to the MRN 2 as Sasha unwinds the cable from the carrier. 92 00:07:47,206 --> 00:07:48,656 Fyodor will install the cable 93 00:07:48,656 --> 00:07:50,976 and the cable fair leads along the F2B. 94 00:07:51,516 --> 00:07:59,756 [ Pause ] 95 00:08:00,256 --> 00:08:03,386 And, again, the digital display shows the cable flashing 96 00:08:03,386 --> 00:08:03,976 and already installed. 97 00:08:04,516 --> 00:08:25,806 [ Pause ] 98 00:08:26,306 --> 00:08:28,386 And Fyodor will attach the cable 99 00:08:28,386 --> 00:08:30,996 to the previously installed patch panel number 2, 100 00:08:30,996 --> 00:08:34,786 and any excess cable will be attached to MRN 2's handrail. 101 00:08:39,226 --> 00:08:41,536 Once Fyodor has completed the patch panel, 102 00:08:41,776 --> 00:08:43,586 Sasha will attach the remaining cable 103 00:08:43,586 --> 00:08:46,716 to an FGB handrail near the US and Russian interface. 104 00:08:47,516 --> 00:08:54,666 [ Pause ] 105 00:08:55,166 --> 00:08:58,226 Then translate down the FGB taking the slack 106 00:08:58,226 --> 00:08:59,976 out of the MLN power cable number 2. 107 00:09:00,516 --> 00:09:13,336 [ Pause ] 108 00:09:13,836 --> 00:09:19,296 Fyodor will attach the cable number 2 to the cable clamps 109 00:09:19,456 --> 00:09:21,976 on the FGB and MRN 2 interface. 110 00:09:22,516 --> 00:09:29,616 [ Pause ] 111 00:09:30,116 --> 00:09:32,946 The two crew members will then translate back to DC1, 112 00:09:32,946 --> 00:09:36,826 and the two members will ingress.